13 KiB
VALIDATION PLAYBOOK
Ziel: Schnell validieren, ob SmartMeter-App ein echtes Problem löst Dauer: 2-3 Wochen Output: GO/NO-GO Entscheidung mit Daten
PHASE 0: Interviews mit Entscheidungsträgern
Zielgruppe
Pro Stadtwerk: 2-3 Personen
1. IT-Leiter (Technical, Integration-Fragen)
2. Kundenservice-Leiter oder Betriebsleiter (Use Case, ROI)
3. CFO/Geschäftsführer (Budget, Priority)
Total Target: 10-15 Stadtwerke
= 20-45 Interviews
Kontakt-Strategie
Tiered Approach:
Tier 1 (Known): Bestehende Kontakte
- LinkedIn Outreach zu IT Directors
- Existierende Geschäftspartner
- Networking Events (VKU)
Tier 2 (Warm): Via Referrals
- Ask friends/advisors for intros
- Chamber of Commerce
- Industry associations
Tier 3 (Cold): Direct Outreach
- LinkedIn Messages
- Email to general contacts
- VKU member database
Template Email:
---
Subject: 15-Min Interview: Smart Meter Lösung für Stadtwerke
Hallo [Name],
wir entwickeln eine mobile App zur automatisierten Zählerablesung
für Stadtwerke. [Your Company] hat Expertise in diesem Bereich und
wir möchten von dir lernen.
Hätte du Zeit für ein 15-Min Call diese Woche? Gerne telefonisch
oder per Zoom.
Danke!
[Your Name]
---
Interview Guide
PART A: Problem Discovery (5 Min)
Q1: Current State
"Wie funktioniert eure Zählerablesung heute?"
Expected Answers (flag if they say):
- Manual reading by customer
- Reading by technician
- Automated meter (smart meter)
- Mix of the above
Red Flag: If 100% automated already → No problem to solve
Green Flag: If manual + high error rate → Good fit
Q2: Problem Validation
"Wie viel Zeit/Kosten investiert ihr jährlich in Zählerablesung?"
Deep Dive:
- "Wie viele Zählerstände werden abgelesen pro Jahr?"
- "Wer macht das - Mitarbeiter oder Kunden?"
- "Wie hoch ist die Fehlerquote?" (Ziel: >20% = pain point)
- "Was kostet euch jede manuelle Ablesung?"
Example Math:
- 100K Kunden × 1 reading/year = 100K readings
- 30% need manual follow-up = 30K manual readings
- @€2 per reading = €60K/year cost
Red Flag: Low error rate (<5%) or low cost (<€20K) → not a pain point
Green Flag: >20% error rate or >€50K/year cost → worth solving
Q3: Current Frustrations
"Welche sind eure Top 3 Probleme mit dem aktuellen Process?"
Listen for:
- Customer disputes over readings
- Staff effort (time-consuming)
- Data quality issues
- Customer complaints (feedback)
- Billing inaccuracies
Probe deeper on each:
- "How often does this happen?"
- "What's the impact?" (Cost? Customer satisfaction?)
- "Who feels the pain most?" (Support team? Finance? Customers?)
PART B: Solution Fit (5 Min)
Q4: Appetite for Change
"Würdet ihr eine Mobile App für die Zählerablesung einführen?"
Expected Answers:
A) "Yes, if it solves [specific problem]"
B) "Maybe, but we need to think about it"
C) "No, not interested"
D) "We're already evaluating solutions"
Green Flag: Answer A or D
Red Flag: Answer C or B (lukewarm interest)
Follow-up:
- "What would make this compelling for you?"
- "What would be blockers?"
- "Timeline - when would you need this?"
Q5: Customer Adoption Likelihood
"Glaubst du, dass deine Kunden eine App nutzen würden
zur Zählerablesung?"
Dig deeper:
- "What % of your customers would use it?" (Target: >20% = viable)
- "What incentives would help adoption?"
- Free (most customers don't care)
- Small discount (€1-2/year per reading)
- Instant feedback (meter consumption insights)
- "Would you push it to customers or wait for demand?"
Red Flag: <10% adoption estimate
Green Flag: >20% adoption estimate
Q6: Integration Feasibility
"Welche Systeme nutzt ihr für Kundenmanagement?"
Record:
- Billing system (SAP, Oracle, Infor, etc.)
- CRM (Salesforce, etc.)
- Meter database (own, external, etc.)
- IT infrastructure (on-prem, cloud, hybrid)
Follow-up:
- "How open is your IT for external integrations?"
- "Who would need to approve this?"
- "Do you have an API layer?"
Red Flag: Very legacy, no API access, slow approval
Green Flag: Modern stack, willing to integrate
PART C: Commercial Viability (3 Min)
Q7: Budget & Pricing
"Wie viel würdet ihr für eine Lösung budgetieren?"
Open-ended first:
- Listen to their thinking
- Don't anchor them to your price
Then probe:
- "Is that annual or one-time?"
- "Would you pay monthly/yearly/license?"
- "What's the ROI threshold?" (Typical: payback in 1-2 years)
Red Flag: Budget <€20K/year or willing to pay only if risk-free
Green Flag: Budget >€50K/year, willing to invest for ROI
Q8: Decision Making Process
"Wie würde so eine Entscheidung ablaufen?"
Map:
- Who needs to approve? (Budget owner, IT, Board?)
- Timeline? (Fast-track vs. normal process)
- RFP required? (Or can you do handshake deal?)
- Contract terms? (1-year, 3-year, multi-year discount?)
Red Flag: Requires months-long RFP, many approvers, slow
Green Flag: Can decide quickly, fewer stakeholders
Q9: Switching Costs
"Wenn die App nicht funktioniert, wie schnell könnt ihr
rückwärts gehen?"
This matters because:
- High switching costs = stickier customer
- Easy exit = customer feels safer trying
Answer:
- "We'd just stop recommending it to customers"
- "We'd need to ramp down over X months"
- etc.
Green Flag: Easy to exit → customer feels safe to try
PART D: Follow-Up / Qualification (2 Min)
Q10: Next Steps
"Wäre es interessant, wenn wir euch eine Demo/Beta
im nächsten Monat zeigen?"
Clear YES:
- "Yes, I want to see this"
- "Yes, let's do a pilot"
Soft YES:
- "Maybe, depends on what I see"
- "Let me talk to my team first"
NO:
- "Not right now"
- "We're happy with our current approach"
Green Flag: Clear YES → Schedule demo/pilot for them
Soft YES: Send materials, follow up in 2 weeks
NO: Thank them, add to "maybe later" list
Q11: Introductions
"Kennst du andere Stadtwerke, die ähnliche Probleme haben?"
Goal: Get warm referrals
- "Can you introduce me to [competitor]?"
- "Would you be willing to be a reference?"
Green Flag: YES on both → builds your network, proof
Data Collection Template
Create a Spreadsheet with:
| Stadtwerk | Size | Contact | Q1 Method | Q2 Cost/Error | Q3 Pain | Q4 Appetite | Q5 Adoption | Q6 Integration | Q7 Budget | Q8 Timeline | Score | Notes |
|-----------|------|---------|-----------|----------------|---------|-------------|------------|-----------------|-----------|-----------|-------|-------|
| Stadt A | 100K | John D. | Manual 50%| €60K, 30% err | High | Yes | 30% | SAP, open | €80K | 2 months | 9/10 | Hot lead |
| Stadt B | 50K | Jane S. | Manual 70%| €40K, 25% err | Medium | Maybe | 15% | Legacy, closed | €30K | 6 months | 5/10 | Cold |
GO / NO-GO Decision Framework
Scoring Matrix
Assign points (1-10) for each question:
Q1: Current Manual Process = ___ / 10
(1 = fully automated, 10 = fully manual)
Q2: Annual Cost/Pain = ___ / 10
(1 = <€10K cost, 10 = >€100K cost)
Q3: Frustration Level = ___ / 10
(1 = not a priority, 10 = huge pain)
Q4: Appetite for Change = ___ / 10
(1 = no, 10 = ready to sign today)
Q5: Customer Adoption = ___ / 10
(1 = <5%, 10 = >50%)
Q6: Integration Feasible = ___ / 10
(1 = impossible, 10 = very easy)
Q7: Budget Available = ___ / 10
(1 = <€20K, 10 = >€100K)
Q8: Fast Decision = ___ / 10
(1 = >6 months, 10 = <1 month)
TOTAL SCORE = Sum of all 8 / 8 × 10 = ___ / 10
Go/No-Go Thresholds
SCORE 8-10: HOT LEADS (Definitely pursue)
- Validate further with second/third meetings
- Structure a pilot/POC
- These are your first customers
SCORE 6-7: WARM LEADS (Worth pursuing)
- Keep in pipeline
- Send materials, stay in touch
- Re-engage in 3 months
SCORE 4-5: COOL LEADS (Maybe later)
- Add to "monitor" list
- Market conditions may change
- Re-approach in 6 months
SCORE <4: COLD LEADS (Not a fit now)
- Don't waste time
- Maybe re-approach if product evolves
Portfolio Requirements for GO Decision
After 10-15 interviews, you need:
✅ GO Signal if:
- 5+ Hot Leads (score 8-10) with €50K+ budget each
- OR 10+ Warm Leads (score 6-7) that could grow into hot
- Average adoption estimate: >20%
- Average budget: >€50K/year
- Market size (sum of budgets): >€500K
❌ NO-GO Signal if:
- <3 Hot Leads
- Average score <5
- Average adoption <10%
- Market size <€300K
- Pattern of "we'll wait and see"
Competitive Positioning
During interviews, also ask:
"Are you evaluating any other solutions?"
Typical answers:
A) "Yes, we're in RFP with SAP/Oracle"
B) "No, but considering some options"
C) "Not actively, but open to ideas"
D) "We tried something similar, didn't work"
Analysis:
- A: You're late, but potentially better/cheaper/faster
- B: You're in conversation, good timing
- C: You're educating the market, need strong proof
- D: Understand what failed, position differently
Use competitive insights to position your MVP:
- Faster to market vs. SAP
- Cheaper than Oracle (€50K vs. €200K+)
- Mobile-first (better UX)
- Customizable (specific to Stadtwerke)
Timeline & Execution
Week 1: Prep & Recruiting
Mon-Tue:
- Create interview guide (this doc)
- Build data collection spreadsheet
- Create email template
Wed-Fri:
- Start outreach (LinkedIn, email, phone)
- Target: 10-15 interviews scheduled
Tools:
- Calendly for scheduling
- Zoom for remote calls
- Google Sheets for data
Week 2-3: Conduct Interviews
Goal: 10-15 interviews (2 per day)
Prep for each:
- Research company (size, industry focus)
- Prepare notes
- Test audio/video
During:
- Record (with permission) or take notes
- Be friendly, genuine, listening-focused
- Don't pitch hard (listen more than talk)
After:
- Score each interview
- Add to spreadsheet
- Send thank you note + case study PDF
Time per interview: 20-30 min (including travel/setup)
Total time: ~10 hours for 15 interviews
Week 4: Analysis & Decision
Mon-Tue:
- Score all interviews
- Aggregate data in spreadsheet
- Create summary report
Wed:
- Team discussion
- GO/NO-GO vote
Thu-Fri:
- If GO: Contact top Hot Leads about pilot
- If NO-GO: Pivot to different pain point or market
Sample Report Template
After Week 3, create:
# VALIDATION REPORT: SmartMeter-Lite App
Date: [Date]
Conducted by: [Name]
## Executive Summary
- 12 Interviews conducted
- 7 Hot Leads (58%), 3 Warm Leads (25%), 2 Cold (17%)
- Average budget: €65K/year
- Market opportunity: €780K in year 1
- **Recommendation: GO** ✅
## Key Findings
1. Manual meter reading is REAL pain
- Avg cost: €50K/year per Stadtwerk
- Avg error rate: 28%
- Top frustration: Customer disputes
2. Market appetite is strong
- 58% very interested (Hot)
- 25% interested (Warm)
- Would pay avg €65K/year
3. Integration is manageable
- 75% have API-accessible systems
- 60% can integrate within 3-6 months
- Legacy systems are minority
4. Customer adoption is solid
- Avg expected adoption: 25%
- Range: 10-40%
- Key: Make it optional (don't force)
## Top Hot Leads
1. Stadtwerke München (100K households, €120K budget, Ready Now)
2. Stadtwerke Köln (80K households, €100K budget, 2-month timeline)
3. Stadtwerke Hamburg (120K households, €150K budget, 3-month timeline)
## Risk Factors
- SAP/Oracle competition (but they're slow)
- DSGVO compliance needed (doable)
- Integration complexity (manageable)
## Next Steps
1. Schedule pilots with top 3 Hot Leads
2. Get signed LOI (Letters of Intent)
3. Begin development in Week 5
4. Deliver MVP in 12 weeks
Key Metrics to Track
After validation, you have:
√ Market Size: €X (sum of budgets from interviews)
√ Win Rate: Y% (Hot Leads / Total)
√ Sales Cycle: Z months (from interviews)
√ Product-Market Fit Score: __ / 10
√ Competitive Landscape: [Summary]
√ Go-to-Market Strategy: [Clear approach]
These become your baseline KPIs.
What NOT to Do
❌ Don't pitch too hard
- Interviews are for listening, not selling
- If they're interested, they'll ask for more
❌ Don't overcommit
- "We can integrate with anything" - No, be honest
- "We can do custom features" - Not in MVP
❌ Don't ask leading questions
- "You have problems with meter reading, right?" (Yes)
- Better: "Walk me through your process" (more honest)
❌ Don't ignore red flags
- "Maybe next year" = Not a hot lead
- Lukewarm interest is not enough
❌ Don't over-engineer based on feedback
- "We'd want X, Y, Z features"
- Don't add them to MVP - they add time/cost
- Just build #1 really well
Success Looks Like
✅ You have 5+ Hot Leads wanting to pilot ✅ You have 3+ Letters of Intent (LOI) ✅ You understand the real problem deeply ✅ You have clear competitive positioning ✅ You know your Unit Economics (€15-30K CAC, €80-120K ACV) ✅ You're confident in 20%+ adoption rates ✅ You can articulate WHY Stadtwerke need this
If you have all of this, you're ready to build.
Document Status: Ready to execute Time to Complete: 3-4 weeks Output: GO/NO-GO + 5+ pilot customers (if GO)