DOKUMENTATIONS-INDEX
Project: SmartMeter-Lite App für deutsche Stadtwerke Status: Ready to Validate & Build MVP Last Updated: Februar 2026
📋 Quick Navigation
🚀 START HERE
| Rolle | Dokument | Zeit | Ziel |
|---|---|---|---|
| Founder | NEXT_STEPS.md | 5 min | Wissen, was diese Woche zu tun ist |
| Investor | EXECUTIVE_SUMMARY.md | 10 min | Investment Case verstehen |
| Developer | LEAN_ROADMAP_MVP.md | 15 min | Development Plan verstehen |
| Sales | VALIDATION_PLAYBOOK.md | 10 min | Interview Guide nutzen |
| Everyone | REALISTIC_VS_OPTIMISTIC.md | 5 min | Aligned sein on realistic expectations |
📚 Document Library
🔴 CRITICAL (Must Read First)
NEXT_STEPS.md
Länge: 10 min read + action items Für: Everybody Inhalt:
- Wochenweise Action Plan (Wochen 1-4)
- Team assembly checklist
- Fundraising timeline
- Risk mitigation strategies
- Success metrics
Wann: Lies das JETZT und starte die Actions Action: Print + put on wall
EXECUTIVE_SUMMARY.md
Länge: 15 min read Für: Investors, Geschäftsführer, Board Inhalt:
- Market opportunity (€5-12M realistic)
- Revenue projections (Y1: €500K-1.2M, Y2: €2-4M)
- Capital requirements (€350-450K MVP)
- Unit economics (ACV, CAC, LTV)
- Risk assessment
Wann: Share mit Investors/Board Format: Ready to present, professional tone
REALISTIC_VS_OPTIMISTIC.md
Länge: 10 min read Für: Everybody (especially founders) Inhalt:
- Side-by-side comparison of 2 scenarios
- Why realistic is better (safer, more capital efficient)
- GO/NO-GO framework
- Investment attractiveness analysis
Wann: When tempted to overcommit/overspend Key Takeaway: Build ONE thing great, not 5 things mediocre
🟠 IMPORTANT (Read This Week)
VALIDATION_PLAYBOOK.md
Länge: 20 min read + 2-3 weeks execution Für: Sales, Founder doing outreach Inhalt:
- Interview guide (11 questions)
- Interview scoring framework
- GO/NO-GO criteria
- Sample report template
- Timeline & execution plan
Wann: Use starting Week 1 (interviews) Execute: Complete by Week 4
LEAN_ROADMAP_MVP.md
Länge: 20 min read Für: CTO, Product Manager, Developers Inhalt:
- Phase 0: Validation (Weeks 1-4)
- Phase 1: MVP Development (Weeks 5-14)
- Sprint-by-sprint breakdown
- Tech stack decisions
- Team structure
- Phase 2: GTM (Weeks 15-26)
- Budget: €350-450K total
Wann: Share with technical team Week 5 Use for: Sprint planning, task breakdown
🟡 SUPPORTING (Read as Needed)
SmartMeter_PRD.md
Länge: 30 min read Für: Product Manager, Designers, Developers Inhalt:
- Product Requirements Document
- User stories
- Feature specifications
- UI/UX requirements
- Success criteria
When: Week 5+ (during development) Use for: Detailed specs, engineering
detailed_use_cases.md
Länge: 15 min read Für: Sales, Product, Design Inhalt:
- 5 detailed customer scenarios
- Before/After comparisons
- ROI calculations per customer
- Objection handling
Wann: Share with prospects Format: Customer-friendly stories
stadtwerke_analysis.md
Länge: 20 min read Für: Deep dive into market Inhalt:
- All 5 pain points explained
- Market size validation
- Competitive landscape
- Detailed opportunity analysis
Wann: Reference document Use for: Understanding full context
quick_reference.txt
Länge: 2 min glance Für: Quick recap Inhalt:
- One-page checklists
- Key metrics
- Timeline overview
- Pricing reference
Wann: Team sync, quick lookups Format: Bullet points, print-friendly
🟢 SUPPORTING (Context Only)
README.md
Länge: 5 min Content: Navigation guide, glossary Wann: First time reading the project
qrmaster_scraped.md
Content: QRMaster market research (background) Relevance: Low (for reference only)
📖 Reading Paths by Role
👨💼 Founder / CEO
Week 1: NEXT_STEPS.md → EXECUTIVE_SUMMARY.md → REALISTIC_VS_OPTIMISTIC.md
Week 2: VALIDATION_PLAYBOOK.md (learn interview process)
Week 3: Conduct interviews (using VALIDATION_PLAYBOOK.md)
Week 5: LEAN_ROADMAP_MVP.md (for development planning)
Week 15: SmartMeter_PRD.md (for GTM)
Time commitment: 5-7 hours reading + 20 hours interviewing + daily 2h management
💰 Investor / Board Member
Quick Path (30 min):
1. EXECUTIVE_SUMMARY.md (15 min)
2. REALISTIC_VS_OPTIMISTIC.md (10 min)
3. NEXT_STEPS.md (5 min) → "OK, when can I invest?"
Deep Dive (90 min):
+ VALIDATION_PLAYBOOK.md (understand market validation)
+ LEAN_ROADMAP_MVP.md (understand execution capability)
+ detailed_use_cases.md (customer stories)
Key questions answered:
- Market size? → EXECUTIVE_SUMMARY.md
- Why not build all 5 solutions? → REALISTIC_VS_OPTIMISTIC.md
- How will you acquire customers? → VALIDATION_PLAYBOOK.md
- Can you execute? → LEAN_ROADMAP_MVP.md
- What's the financial return? → EXECUTIVE_SUMMARY.md
👨💻 CTO / Lead Developer
Week 1: LEAN_ROADMAP_MVP.md (architecture, team, timeline)
Week 2: SmartMeter_PRD.md (detailed specs)
Week 3: Tech stack decision (using roadmap as guide)
Week 5: Sprint planning begins
Key outputs:
- Tech stack chosen
- Development environment set up
- CI/CD pipeline ready
- Sprint 0 complete
🎯 Product Manager
Week 1: NEXT_STEPS.md + LEAN_ROADMAP_MVP.md
Week 2: SmartMeter_PRD.md (deep dive)
Week 3-4: VALIDATION_PLAYBOOK.md (customer feedback)
Week 5+: Execute roadmap, track KPIs
📞 Sales / Business Development
Week 1: VALIDATION_PLAYBOOK.md (learn interview framework)
Week 1-3: Conduct 10-15 interviews (Week 1-3)
Week 4: Scoring & go/no-go analysis
Week 15: detailed_use_cases.md (customer stories)
Week 15+: Sales & pipeline management
🎨 Designer
Week 5: SmartMeter_PRD.md (user stories + requirements)
Week 5-7: Create design system, wireframes, prototypes
Week 7+: Design sprint implementation
🗂️ File Organization
C:\Users\a931627\Documents\stadtwerke-saas-analysis\
CRITICAL (Read First):
├── NEXT_STEPS.md [Action plan - Week by week]
├── EXECUTIVE_SUMMARY.md [Investor pitch]
└── REALISTIC_VS_OPTIMISTIC.md [Keep team grounded]
EXECUTION (Operational):
├── VALIDATION_PLAYBOOK.md [Interview guide + scoring]
├── LEAN_ROADMAP_MVP.md [Development roadmap]
└── SmartMeter_PRD.md [Product specs]
SUPPORTING (Reference):
├── detailed_use_cases.md [Customer stories]
├── stadtwerke_analysis.md [Market analysis]
├── quick_reference.txt [One-pagers]
├── README.md [Original overview]
└── implementation_roadmap.md [Original detailed roadmap]
BACKGROUND (Info Only):
└── qrmaster_scraped.md [Earlier research]
⏰ How to Use This Project
Phase 0: VALIDATION (Weeks 1-4)
Primary docs:
✓ NEXT_STEPS.md (Week 1 tasks)
✓ VALIDATION_PLAYBOOK.md (Conduct interviews)
✓ REALISTIC_VS_OPTIMISTIC.md (Stay grounded)
Secondary:
✓ EXECUTIVE_SUMMARY.md (For investors if fundraising)
Output: GO/NO-GO decision + 3-5 signed LOIs
Phase 1: MVP DEVELOPMENT (Weeks 5-14)
Primary docs:
✓ LEAN_ROADMAP_MVP.md (Development plan)
✓ SmartMeter_PRD.md (Product specs)
Secondary:
✓ NEXT_STEPS.md (Execution tracking)
✓ REALISTIC_VS_OPTIMISTIC.md (When scope creep tempts)
Output: Production-ready MVP + 5 beta customers
Phase 2: GO-TO-MARKET (Weeks 15-26)
Primary docs:
✓ detailed_use_cases.md (Sales collateral)
✓ NEXT_STEPS.md (Sales execution)
✓ EXECUTIVE_SUMMARY.md (For new investors)
Secondary:
✓ VALIDATION_PLAYBOOK.md (Reference for sales process)
Output: 5-8 paying customers, €50-100K MRR
🎯 Key Metrics by Phase
Phase 0 Success (Week 4)
- 10+ interviews completed
- 5+ Hot Leads identified
- 3+ LOIs signed
- GO/NO-GO decision made
Phase 1 Success (Week 14)
- MVP released (iOS + Android)
- 5 beta customers onboarded
- NPS feedback > 40
- Production metrics solid
Phase 2 Success (Week 26)
- 5-8 paying customers
- €50-100K MRR achieved
- NPS > 50
- Word-of-mouth building
📊 Document Statistics
| Document | Pages | Time to Read | Audience | Priority |
|---|---|---|---|---|
| NEXT_STEPS.md | 12 | 10 min | Everyone | 🔴 CRITICAL |
| EXECUTIVE_SUMMARY.md | 14 | 15 min | Investors/Board | 🔴 CRITICAL |
| REALISTIC_VS_OPTIMISTIC.md | 10 | 10 min | Everyone | 🔴 CRITICAL |
| LEAN_ROADMAP_MVP.md | 12 | 20 min | Dev/PM | 🟠 Important |
| VALIDATION_PLAYBOOK.md | 14 | 20 min | Sales/BD | 🟠 Important |
| SmartMeter_PRD.md | 18 | 25 min | Dev/Design | 🟠 Important |
| detailed_use_cases.md | 10 | 15 min | Sales | 🟡 Supporting |
| stadtwerke_analysis.md | 17 | 20 min | Reference | 🟡 Supporting |
| quick_reference.txt | 24 | 5 min | Quick lookup | 🟡 Supporting |
Total Learning Time: ~2 hours (complete review) Total Time to Execute: ~20-30 weeks
✅ Before You Start
Make sure you have:
- Access to all documents (you're reading this, so ✅)
- Core founding team identified (Founder + CTO)
- €20-30K available for validation phase
- 5-10 personal contacts at Stadtwerke (or can get intros)
- Willingness to validate before building (don't skip Phase 0!)
🚀 First Actions (TODAY)
-
Read: NEXT_STEPS.md (10 min)
-
Read: REALISTIC_VS_OPTIMISTIC.md (10 min)
-
Decide: Are you committed to this?
- IF YES → Do Week 1 tasks (NEXT_STEPS.md)
- IF NO → Discuss what's holding you back
-
Share: Send EXECUTIVE_SUMMARY.md to 5 potential investors
-
Meet: Have kickoff call with CTO candidate using LEAN_ROADMAP_MVP.md
📞 Quick Reference
| Need | Document | Section |
|---|---|---|
| "What should I do this week?" | NEXT_STEPS.md | "THIS WEEK" |
| "Is this financially viable?" | EXECUTIVE_SUMMARY.md | "Financial Projections" |
| "How do I interview customers?" | VALIDATION_PLAYBOOK.md | "Interview Guide" |
| "How long will development take?" | LEAN_ROADMAP_MVP.md | "Sprint Breakdown" |
| "What are we building?" | SmartMeter_PRD.md | "Overview" |
| "Why not build all 5 solutions?" | REALISTIC_VS_OPTIMISTIC.md | "Why Realistic is Better" |
| "What are the risks?" | NEXT_STEPS.md | "Risk Mitigation" |
| "What features does the app have?" | SmartMeter_PRD.md | "Feature List" |
🎓 Learning Resources
Useful to read alongside this project:
Books:
- "Lean Startup" by Eric Ries
- "The Innovator's Dilemma" by Clayton Christensen
- "Traction" by Gabriel Weinberg
Frameworks:
- Jobs to be Done (JTBD)
- Product-Market Fit
- Unit Economics
- TAM/SAM/SOM
Online:
- Y Combinator Startup School (free)
- Paul Graham essays
- First Round Review
📝 Document Version Control
| Version | Date | Changes |
|---|---|---|
| v1.0 | Feb 17, 2026 | Initial creation - Realistic MVP focus |
| - | - | - |
Last Updated: February 17, 2026 Next Review: After Phase 0 GO/NO-GO decision
❓ FAQ
Q: Do I need to read all documents? A: No. Start with the CRITICAL section. Read others as needed for your role.
Q: Can I skip Phase 0 (Validation)? A: No. DO NOT SKIP. This saves you from building something nobody wants.
Q: Should I raise money before or after Phase 0? A: Start fundraising in Week 3-4 (while doing final interviews). Close by Week 7.
Q: How much money do I really need? A: €350-450K for MVP. €600-800K with runway is safer.
Q: What if validation shows NO-GO? A: Pivot to Pain Point #2 or #3. Same interview process, different solution.
Q: Can I build all 5 solutions? A: No. That's why we wrote REALISTIC_VS_OPTIMISTIC.md. Read it.
🎁 Bonus: How to Share This Project
With Investors: → Send EXECUTIVE_SUMMARY.md + link to this INDEX
With Team: → Share NEXT_STEPS.md + relevant role-specific docs
With Advisors: → Send full folder + ask for feedback on LEAN_ROADMAP_MVP.md
With Customers (During Validation): → Share detailed_use_cases.md + ask for feedback
🏁 Final Checklist
Before you consider Phase 0 complete:
- Read all CRITICAL documents
- Form core team (Founder + CTO)
- Secure €20-30K budget
- Complete 10-15 customer interviews
- Score interviews using VALIDATION_PLAYBOOK.md
- Make GO/NO-GO decision
- (If GO) Get 3+ signed LOIs
- (If GO) Start fundraising
Then proceed to Phase 1 with confidence. 🚀
THIS IS YOUR NORTH STAR. Bookmark this page and refer to it weekly.
Questions? Re-read NEXT_STEPS.md → "Risk Mitigation Actions" section.
Good luck! 🚀